{"id":6592,"date":"2025-01-20T07:13:01","date_gmt":"2025-01-20T07:13:01","guid":{"rendered":"https:\/\/xjenzamalta.mt\/?p=6592"},"modified":"2025-03-17T06:32:01","modified_gmt":"2025-03-17T06:32:01","slug":"go-to-market-accelerator-programme-gtm","status":"publish","type":"post","link":"https:\/\/xjenzamalta.mt\/mt\/2025\/01\/20\/go-to-market-accelerator-programme-gtm\/","title":{"rendered":"Go To Market Accelerator Programme (GTM)"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1216.8px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p>The Go To Market Accelerator Programme is designed to support the final stages of <strong>Technology Readiness Level (TRL)<\/strong> advancements, helping innovators deploy their product or service into operational environments. This grant facilitates <strong>optimization, verification, and validation<\/strong> activities, ensuring that prototype-stage innovations are ready for real-world applications.<\/p>\n<p><strong>Programme Overview<\/strong><\/p>\n<ul>\n<li><strong>Target TRL:<\/strong> From <strong>TRL 5-6<\/strong> to <strong>TRL 7-8<\/strong><\/li>\n<li><strong>Funding:<\/strong> Up to <strong>\u20ac150,000<\/strong><\/li>\n<li><strong>Project Duration:<\/strong> <strong>24 months<\/strong><\/li>\n<\/ul>\n<p>The programme supports projects that build on previous development efforts to complete the innovation&#8217;s development cycle.<\/p>\n<p><strong>Eligibility &amp; Requirements<\/strong><\/p>\n<p>Applicants must first complete a <strong>Feasibility Study<\/strong> under the <strong>Commercialisation Voucher Programme (CVP)<\/strong>. This includes:<\/p>\n<ol>\n<li><strong>Intellectual Property Check<\/strong>: Identifying novel elements of the technology.<\/li>\n<li><strong>Commercial Viability Test<\/strong>: Assessing market research and economic impact.<\/li>\n<\/ol>\n<p><strong>Feasibility Study Details<\/strong>:<\/p>\n<ul>\n<li><strong>Value:<\/strong> \u20ac14,000 (excluding VAT)<\/li>\n<li><strong>Duration:<\/strong> 16 weeks<\/li>\n<li><strong>Support:<\/strong> Conducted with Xjenza Malta\u2019s pre-approved service providers.<\/li>\n<\/ul>\n<p><strong>Important Dates<\/strong><\/p>\n<ul>\n<li><strong>Online Information Session:<\/strong><br \/>\n\ud83d\udcc5 Monday, <strong>3rd February 2025 <\/strong>at <strong>10:00 CET<\/strong><br \/>\n<strong><a href=\"https:\/\/www.youtube.com\/watch?v=qBF8g31W1Ws\">Click to view the Information Session<\/a><\/strong><\/li>\n<li><strong>Submission Deadline:<\/strong><br \/>\n\ud83d\udcc5 Friday, <strong>14th March 2025<\/strong>, by <strong>23:59 CET<\/strong><\/li>\n<\/ul>\n<p><strong>Submission Process<\/strong><\/p>\n<p><span data-teams=\"true\">The program rules have been slightly updated to better simplify the process flow from the feasibility assessment to the grant component. Please refer to Section 7 for details.<\/span><\/p>\n<p>Applicants must submit the following documents electronically to <strong>gtm.xjenzamalta@gov.mt<\/strong>, keeping <strong>Mr. Kyle Bonnici<\/strong> (<a href=\"mailto:kyle.bonnici.4@gov.mt\">kyle.bonnici.4@gov.mt<\/a>) in copy:<\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/GTM-Accelerator-Application-Form-1.docx\">Click to download the Go To Market Accelerator Application Form<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/Non-RKDO-Declaration-Form-3.docx\" target=\"_blank\" rel=\"noopener\">Click to download the Non-RKDO Declaration Form<\/a> <\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/RKDO-Declaration-Form.docx\" target=\"_blank\" rel=\"noopener\">Click to download the RKDO Declaration Form<\/a> <\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/De-minimis-Declaration-Form-4.docx\">Click to download the De-minimis Declaration Form<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/GBER-Declaration-on-Augmented-Aid-Intensity.docx\" target=\"_blank\" rel=\"noopener\">Click to download the GBER Declaration on Augmented Aid Intensity<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/Size-Declaration-Undertaking-in-Difficulty-GBER.xlsx\" target=\"_blank\" rel=\"noopener\">Click to download the Size Declaration &amp; Undertaking in Difficulty GBER<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/Additional-Declerations-form.docx\" target=\"_blank\" rel=\"noopener\">Click to download the Additional-Declerations-form<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/Detailed-Budget-Breakdown-Form.xlsx\" target=\"_blank\" rel=\"noopener\">Click to download the Detailed Budget Breakdown Form<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/Scientific-Areas-as-Specific-Areas-of-Research.pdf\" target=\"_blank\" rel=\"noopener\">Click to download the Scientific-Areas-as-Specific-Areas-of-Research<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/GTM-Accelerator-2025-Call-Opt-A-3.pdf\">Click to download the GTM Accelerator 2025 Call Opt A<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/01\/GTM-Accelerator-2025-Call-Opt-B.pdf\">Click to download the GTM Accelerator 2025 Call Opt B<\/a> <\/strong><\/p>\n<p>\ud83d\udccc <strong>Note<\/strong>: Late or incomplete applications will not be considered. All submissions will receive an acknowledgment via email.<\/p>\n<p><strong>Evaluation<\/strong><\/p>\n<p>Applications will be reviewed by a selection panel appointed by Xjenza Malta. Evaluation criteria are outlined in the <strong>Call Text<\/strong>.<\/p>\n<p><strong>Need More Information?<\/strong><\/p>\n<p>For inquiries, contact:<br \/>\n<strong>Mr. Kyle Bonnici<\/strong><br \/>\n\ud83d\udce7 Email: <a href=\"mailto:kyle.bonnici.4@gov.mt\">kyle.bonnici.4@gov.mt<\/a><br \/>\n\ud83d\udcde Phone: (+356) 2360 2209<\/p>\n<p><img decoding=\"async\" class=\"lazyload wp-image-6937 aligncenter\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27807%27%20height%3D%27635%27%20viewBox%3D%270%200%20807%20635%27%3E%3Crect%20width%3D%27807%27%20height%3D%27635%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/xjenzamalta.mt\/wp-content\/uploads\/2025\/02\/service-providers-300x236.jpg\" alt=\"\" width=\"807\" height=\"635\" \/><\/p>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":5,"featured_media":6593,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[50],"tags":[],"class_list":["post-6592","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-closed-funding-scheme"],"_links":{"self":[{"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/posts\/6592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/comments?post=6592"}],"version-history":[{"count":13,"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/posts\/6592\/revisions"}],"predecessor-version":[{"id":6942,"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/posts\/6592\/revisions\/6942"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/media\/6593"}],"wp:attachment":[{"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/media?parent=6592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/categories?post=6592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/xjenzamalta.mt\/mt\/wp-json\/wp\/v2\/tags?post=6592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}